Carpe Diem, Spring in CA

Adventures in the Past Few Months

Our calendar has been packed the past few months with short adventures and weekend trips, all flavored with a strong dose of short notice spontaneity and disorganization. With the project shutdown and layoff I felt the need to take advantage of every single day between the announcement of the project shutdown and the end of my notice period when I would be officially unemployed. It was such a whirlwind of last minute plans we even packed for trips that never happened!

Tahoe Northstar

Our adventures began with a last-minute trip to Tahoe Northstar. We booked our stay at 10 PM the night before leaving  yet still managed to travel in style. I rented a Tesla Model Y to try out self-driving during the long (for us) trip up to the mountains. The car added some fun for me, though I’m not sure the kids noticed much difference. Continue reading “Carpe Diem, Spring in CA”

Max, with help from gpt-2

This post is written with the assistance of GPT-2. Sections written by me are used as model prompts, and the model output is then modified or curated and able to be used again in following prompts.


Beginning of post


August 23, 2021:

[P1] Megan woke me early in the morning around 3am and said it was time to go have a baby, her water had broken an hour earlier. We sprung into action, though with a tiny bit less apprehension than the first time with Jane. After a long day but mostly typical delivery Max Thomas Cosgrove was born. Birth specifications are as follows:

Length: 50.8 cm (1′ 8”)

Weight: 3.15 kg (6 lb 15.1 oz)

Head Circumference: 36 cm (14.17”)

Apgar One: 9.0

Apgar Five: 9.0

Gestation Age: 39 2/7 wks

[S1] Having another baby was the goal, so that we could round out the family and give Jane a sibling. There are a lot of factors that go into any pregnancy. Luckily for us Megan didn’t have any issues getting pregnant. Recently I’ve noticed that it’s really hard for many to get pregnant. This one was a little different than Jane, mostly because we are so busy keeping up with Jane already. The pregnancy passed quickly and even since Max has been here life just keeps rushing on by. Continue reading “Max, with help from gpt-2”

3 weeks at the beach, Capitola, CA

Since the pandemic began, I watched my coworkers’ locations change throughout the year. Some moved permanently out of state to places like Montana, Michigan, New York and Texas. Others have moved within the state but out of the Bay Area, also for the long term. And most seem to have done some extended traveling. It was nice this past summer to have some routine going to work in the labs and having a normal workday again, but after talking to another engineer on the project who doesn’t do lab work and who spent three months working from Hawaii it’s hard not to get a bit jealous. He told me because of the time zone he was off work by 3:30 PM every day and spent the afternoons surfing.

My current job will never be fully remote, although I can do much of it from anywhere, and Megan’s clinic days mean that for now at least, we can’t easily move to Hawaii. But I’ve been feeling all along during this pandemic that I don’t want the opportunities it presents to pass by  unnoticed since it is (hopefully) a very unique situation and time. So with this as context, when Megan asked for some input on a weekend beach rental for my birthday this year, I asked why not go for a month instead.

 

Continue reading “3 weeks at the beach, Capitola, CA”

Time off, 11/23/2019 – 01/06/2020

Two weeks into my planned company shutdown / paternaty / sick leave I started to really feel checked out from work. The first week off was company shutdown for the week of Thanksgiving and between the holiday and some other activites it still felt busy. The second week when everyone else was back at work I was still checking in daily and getting a few texts and calls for support. After this though, work communication slowed down and I really got into the swing of being away from work.

A colleague of mine (Foo Hooi Lee) reguallary takes all of his vacation between Thankgiving and the New Year in order to travel back to Malasia for a few weeks each year. In years past I haven’t had the nessesary time banked to pull this off but thanks to Jane and Apple’s paternaty leave policy this year I had the hours. I talked to Behnam about my plan for this back in July and he agreeded provided the AS platform was stable and I had a good software release process established which Hesam or Dan could take over while I was out. The big 2019 demos were planned in mid Decemeber and early January so it would be hard to justify leaving if we still had a fragile software platform. So over the course of the fall I worked a lot with this in mind and in early Novemeber we agreeded things were in a good enough place for me to take the whole block of time.

 

Continue reading “Time off, 11/23/2019 – 01/06/2020”

Sailing Trip, San Francisco Bay, CA

“Stab it! Stab it! Did you get it? Stab it!” *

“Ahh… I’m trying”

“Alright! Nice! Now pull it back and cleat it.”

This was the end of the scene that played out in Ayala Cove on Angel Island this Labor Day as we were hooking up to the mooring balls to spend the night on our sailboat for the first time outside of a marina. I was driving trying to get the boat into position and Megan was hanging off the bow, attempting to use our boat hook to feed the line through the loop on top of the floating mooring ball.

Continue reading “Sailing Trip, San Francisco Bay, CA”

bzzzztt

May 4th had the makings of a typical day. I rode my bike to work in the morning, and got a call from a coworker about 10 minutes before arriving to my building. He wanted to move a piece of equipment in order to test it in another area of the lab. He wanted a hand when I got there. “No problem.” I said.

I arrived, changed out of my riding clothes, and walked to the other end of the lab. Young, my coworker, hadn’t arrived yet, so I went over and started to unplug the equipment. It was only a single connection, albeit a big one: one hundred and fifty amps, 3 phase, 480VAC. The type of plug for this power is necessarily big, about the length of your forearm with a cable about as thick. Because of the weight, the plug has a screw collar to secure it to the receptacle, which is another large device permanently hung on the wall by a licensed electrical contractor when the feed gets installed.

Due to legal liability electrical contractors typically do not complete the work after the receptacle. They will bring power to the building, and distribute it within the building to receptacles, but their work stops there. Apparently with custom made hardware and prototypes like I work with, they perceive too much risk that bad information from engineers or poorly designed equipment can lead to legal responsibility if they were to connect power and have something fail.

So one of the Apple technicians cut the wire, stripped the leads, and made the connections inside before attaching the connector housing and closing it up. Or so it seems… The team responsible for the equipment blames it on the electrical contractor, who they say wired the plug side before they made the final connections to the bus inside the equipment. The electrical contractor of course denies this. Either way, the job was done with negligence, and very poor workmanship.

Back to the unplugging. I walked into the test cell and made sure the equipment was off. I then unscrewed the collar, began to slide out the plug, and BANG! One of the phases dislodged from its precarious connection to the pin inside and shorted to the connector housing. A big arc, shock, flash and bang immediately erupted from the connector and onto my hand which was wrapped around the housing. Upstream, the disconnect tripped* due to the huge overcurrent. This probably a few 10s of miliseconds after the phase first began arcing and shorted to ground. This deenergized the circuit.

I was figuratively blown away and had to take a moment to realize what had happened. I was still standing and my heart and mind were racing. I looked down at my blackened hand and tried to take stock of my overall condition. I then walked out and found some coworkers who had started to make their way over after hearing the bang and correctly assumed arc flash. When what happened began to settle in, I sat down and tried to relax. I called our EHS coordinator to inform him of the incident and describe what happened. I was directed to urgent care and was taken for treatment by one of the coworkers.

My first stop was for an exam and an EKG. I was then sent to the ER for blood tests, more exams, and observation. Apparently if the immediate shock, burn, or heart issues don’t get you, kidney shutdown a few hours afterward can. All of this was very scary. I called Megan while at the urgent care and she came quickly to the ER once it was apparent where I was headed.

Luckily as of today it seems that all is well, and given the potential realm of outcomes I was very lucky. I ended up with a terrible scare but only minor physical impacts**.

Emotionally, on the day of the event, the closeness of it hadn’t hit me. After leaving the ER Megan and I stopped to get falafel for a late lunch, just like we might on a normal weekend. It wasn’t until a few days later, when I had been back to work and seen the damaged equipment that it did. My confidence around this equipment has been shaken and my faith in my coworkers attention to detail has been too. Its going to be difficult to get comfortable being in the lab again. Shortly afterward I decided to be more reserved with my involvement in HV systems and I told my close coworkers that I’m no longer going to be lending a hand in this area. They all had the same reaction, that my decision was totally understandable, but I imagine it will cause some difficultly at times in the future.

It’s still on my mind daily when at work, considering I’m surrounded by high power equipment in the lab, but outside of work things seem back to normal. Megan and I both got a serious reminder about how easily things can change, but luckily this time, they didn’t have to. Though even now, as I’m typing this, my stomach is churning a bit at the thought of how a small change in circumstance could have led to a much worse outcome.

  *In the post incident investigation, it was found that the disconnect failed as well. The evidence of the huge current interrupted was displayed by a black coating of carbon inside and out of the enclosure. **My hand was sore for a few days, the burn was first degree, and my second EKG a week later confirmed that nothing of major concern was going on with my cardiac system. — ## Media URLs recovered – https://www.cosgrove.blog/wp-content/uploads/2018/05/IMG_8433-scaled.jpg _(present on live cosgrove.blog)_ – https://www.cosgrove.blog/wp-content/uploads/2018/05/IMG_8435-scaled.jpg _(present on live cosgrove.blog)_ – https://www.cosgrove.blog/wp-content/uploads/2018/05/IMG_8436-scaled.jpg _(present on live cosgrove.blog)_ – https://www.cosgrove.blog/wp-content/uploads/2018/05/IMG_8437-scaled.jpg _(present on live cosgrove.blog)_ ## Recovery notes Full post (~946 words). Live was truncated mid-story after electrical incident intro. Lost to the sands of time…

               +    .  #    .     @   .       *    .       .      *      *  .  .     *   .     *         .  *    .  *         *    .         +
        * .     .   *        *  .      .  *    .    .    *   .    *       .  *      *   .  *    .   *     .    *   .   *    .   *  .    *    .   *
     .    *      *  .    *  .    .  *    .   *   .   *   .    * .      *  .      *     .    *    .  *   .    *  .    *    .  *    .   *   .    *  .
 *   .     *    .     *    .  *    .  *  .   *   .    * .   *    .  *      *   .   *  .    *  .   * .   *    .   *    .  *   .    *  .   *    .   *  .
     .    *  .    *   .    * .    *   .    *    .    *   .    *   .    *    .      *   .  *    .    *  .    *  .    *  .    *    .   *   .    *  .   *    .
    .  *    .  *     .    *  .    * .     *    .    *    .    *    .  *  .     *   .   *  .    *  .   * .    *   .   *    .   *   .    *   .    *  .    *
     .   *   .    *     .    *    .  *    .    *   .   *   .    *   .    *   .   *   .    *   .   *  .    *   .   *    .   *    .   *    .   *   .   *  .
    *  .    *    .    *   .   *  .    *    .    *  .   *    .   *  .   *   .   *  .    *   .   *  .    *   .   *    .   *   .    *   .    *  .   * .
  .   *    .   *   .   *   .   *   .   *   .   *    .   *   .    *   .    *   .   *   .    *   .   *   .    *   .    *  .   *    .    *  .    *  .    *  .
  *    .   *  .    *   .   *   .    *   .    *   .   *   .    *   .    *  .    *   .    *  .    *   .   *   .    *   .    *  .   *   .    *   .    *   . *

 

Chile

At about 1:00 in the afternoon, the power went out in the Panama City International Airport. There wasn’t much of a reaction from the staff in the Copa Club lounge though so Megan and I continued as usual. I had been about to take a nap with Megan on bag watch after our layover showers, business class travel is rough. We we’re half way to our destination, Santiago, Chile, and a trip we had been talking about for well over a year. An hour or so later, with power restored, headed to the gate for the next half of the flight South.

Our plan was to fly into Santiago and head to the coast for 4-5 days, staying in Valpariso where Megan studied aborad 10 years before, and then Pichilemu, a surf town we had been scouting online. After this we would fly to Puerto Montt and Northern Patagoina in order to visit the new Chilean park, Pumalin Park, and spend time in nearby Puerto Varas. Then make the final leg to Southern Patagoina and visit Torres del Paine, and the adventure hub of Puerto Natales. We decided on this two and a half week iteniary after years of wanting to move abroad to live for a year. Originally we thought to simply quit our jobs and move, first to Pichilemu, then it was Puerto Varas since streetview in Pichelemu looked a bit rough. In retrospec, this may have been, if not a mistake, a bit more than we bargined for. While it would be nice to have a much extended break from our busy lives, we both ended up having a fantastic time despite the abreviated scope of the trip, and are already looking forward to our next trip aborad.

 

Continue reading “Chile”

Honeymoon Video

Welp, here it is.

When we took our motorcycle trip down HWY1 we took a ton of video from the bike and and basically zero video of ourselves at the countless stops and activities. It took a while to edit down to capture the road trip and then record some audio to help the paint drying process, but it was fun and Megan and I are both pretty glad we have this as a way to remember our trip.

 

Continue reading “Honeymoon Video”

Party at the Ritz

This year Apple out did them selves. Our SPG Holiday Party was at the Ritz Carlton in Half Moon Bay. I actually almost missed the signup deadline since it was fairly early in November, but luckily we got our names on the list and booked ourselves a room at the hotel for the night as well. 

It turned out to be a fairly decadent weekend. We were coming off of a week of vacation in San Diego for Thanksgiving, and that Friday we were delivered some Dungeness crab from our fish share. We ate up Friday evening and then Saturday we spent the morning relaxing at a coffee shop before checkin. Checkin time was at 4pm and we arrived promptly at 4 in order to take full advantage of our stay at the hotel. Everyone else who was staying had the same plan and there was a bit of a wait in order to get into the valet area but we survived and got our room at the nicest hotel either of us had ever stayed at.

 

Continue reading “Party at the Ritz”

First Anniversary – Palacio Los Gatos – 10/10/2016

Our first wedding anniversary. We made it a whole year.

On our actual anniversary we were recovering from a long day of moving furniture and boxes. The 10th was Monday, and the previous weekend we spent in Colorado. We had flow to Denver on the Thursday before in order to attend Matt Olsen’s wedding in Estes Park. It was a great event and we got to see a few old friends we hadn’t see in a while.

 

Continue reading “First Anniversary – Palacio Los Gatos – 10/10/2016”